Verification, welded in.

Inspection software, built by an inspector.

Inspectors capture welds directly in the field. Photo, GPS, and heat numbers scanned (where the materials vendor provides barcoded tags) or typed at the joint. One capture drives the WPS audit, the daily report, and the heat-to-BOM trace. No nightly data entry, no second pass. Built by a working chief inspector whose 18+ year pipeline career started as a contractor laborer. The roots of this system run deep.

Built for AWS · ASME · API 1104 transmission and distribution work.

LIVE DEMO · CEDAR CROSSING · SAMPLE DATA
01 · WHO IT'S FOR

Your CWIs spend half their day on paperwork.
Let Veriweld do it instead.

Mobile-first field capture replaces the field book, the spreadsheet, and the nightly data-entry marathon. Inspectors log welds on mobile while they’re standing next to the joint. Photo, GPS, heat numbers scanned or typed at the source. DPRs assemble themselves from the day’s activity. CWIs focus on the welds. The project stays on schedule.

CONTRACTORS · WELD LOG
Veriweld weld log sample data showing RT and MT welds with joint numbers, heat numbers, welder stencils, NDT results, and inline edit.
See Veriweld for contractors →

Cross-organization QC visibility.
Part 192-ready turnover.
No finger-pointing.

Grant your QMs read-only visibility into your contractor’s project: the welds, the heats, the NDT results, the audit trail, as they happen. No waiting for a weekly summary. No last-month closeout scramble. Every NDT result cross-referenced to its weld. Every edit captured with user, timestamp, and before/after values. Survives a PHMSA review.

OPERATORS · AUDIT TRAIL
Veriweld audit trail sample data showing every edit with user, timestamp, field, before and after values.
See Veriweld for operators →
02 · WHAT VERIWELD DOES

What Veriweld actually does.

The data starts at the weld, not at the desk.

Inspectors capture the weld on mobile while standing next to it. Photo, GPS, and heat numbers (scanned when the vendor provides barcoded tags, typed when they don't) attach at the source. The office system has the data before the crew breaks for lunch. No spreadsheet, no end-of-day transcription, no 'send me the numbers by 7pm.'

The WPS check happens at the joint, not at audit.

Every weld is checked against the project’s WPS the moment it’s logged. The system verifies the welder holds a current qualification for the procedure, and that diameter, position, electrode, amps, volts, and preheat fall within the qualified range. Verdicts surface inline on desktop and as a warning on the mobile submit screen — non-compliant work gets caught while the crew is still on the joint, not in a turnover review three months out.

The DPR writes itself from the day’s welds.

Every weld, NDT result, correction, and report from the day rolls up into a draft DPR automatically. The inspector adds weather, crew, and narrative. Signs. Done. What used to take two hours takes twenty minutes.

The turnover package is always ready.

Every weld ties to its heat, its NDT result, and its inspector sign-off the moment it’s logged. When turnover day comes, the 49 CFR Part 192 package is already built. Complete, audited, and ZIP-exportable. No reconstruction month.

03 · HOW IT WORKS

From field capture to turnover, in one system.

  1. 01

    Capture

    Inspectors capture the weld on mobile while they're standing next to it. Photo, GPS, and heat numbers (scanned where the materials vendor provides barcoded tags, typed when they don't) attach at the source. Joint number, welder stencil, WPS, date filled as they work. The office system has the weld before the crew breaks for lunch.

    01 · FIELD · MOBILE
    Veriweld mobile field capture: inspector logs a weld with photo, GPS, and heat numbers scanned or typed at the joint.
  2. 02

    Sync

    Bidirectional sync moves captures from mobile to the office system the moment connectivity returns. Offline in the ditch? Writes queue locally and replay on reconnect. Conflicts route to a review queue with both versions preserved. Office dashboards update live. No 'send me the numbers by 7pm.'

    02 · MOBILE ↔ OFFICE
    Veriweld sync. Mobile captures flow to the office system automatically, with offline queueing when connectivity drops.
  3. 03

    Verify

    Anything with uncertain signals lands in a review queue: heats without a clean BOM match, cross-olet candidates, low-confidence extractions. The Chief or Quality Manager reviews and approves. Every edit is captured in an audit trail with user, timestamp, field, and before/after values. The weld log, NDT log, and heat-to-BOM map update as you go.

    03 · REVIEW · AUDIT
    Veriweld review queue and audit trail. Uncertain matches land for human review; every edit captured with user, timestamp, and before/after values.
  4. 04

    Turnover

    Daily progress reports generate themselves from the day’s welds. Turnover packages ZIP on demand with a 49 CFR Part 192 cover sheet. Nothing to chase down, nothing to reconstruct. Turnover day becomes a download, not a month-long scramble.

    04 · DPR · PART 192
    Veriweld daily progress report: automatically generated from the day's welds, NDT results, and corrections, ready for turnover.
04 · CAPABILITIES

Built for the whole job.

Field capture is the doorway. Once a weld is in the system, every downstream artifact a pipeline project owes — the audit, the report, the schedule, the turnover — runs from that one event.

Heat-to-BOM traceability, automatic.

Every weld traces back to its heats, every heat to its BOM line, every BOM line to its purchase order. Pull any weld and walk the chain in seconds — no spreadsheet to reconcile, no inspector tracking heats by hand.

Material receiving feeds QC directly.

When inbound material lands with heat numbers, those heats are in the QC system the same minute. No CWI typing heat numbers off mill certs at end of day. No transcription error to chase down at audit.

Self-serve project onboarding.

Upload your engineering BOM PDFs and the project is live in under an hour. New CWI on the next project, different report format? Map the fields yourself in 10 to 15 minutes. No engineering ticket, no “we’ll get to it next sprint.”

WPS audit at every weld submit.

Every weld is checked against its WPS the moment it’s logged: welder qualification, diameter, position, electrode, amps, volts, preheat. Verdicts surface inline on the same screen the inspector just submitted from.

Schedule and cost update from the field.

Welds drive activity percent-complete on the schedule. Receiving and POs drive cost roll-ups. The PM dashboard is current without anyone chasing an Excel update.

Push for the events that matter.

Repair welds, NDT rejections, sync conflicts, change-order approvals — push to the inspector or admin who needs to know. Not a feed firehose, just the events worth interrupting for.

Cross-organization read-only visibility.

Pipeline operators get a project-scoped read-only window into contractor work — welds, heats, NDT, audit trail. Contractors keep control of who sees what, and for how long.

Connect your stack.

REST API, signed webhooks for events as they happen, OAuth2 client credentials for integrations. The data flows out as cleanly as it goes in — no proprietary export gate.

05 · PROVING GROUND

Proven on real projects.

Veriweld has been used and tested on live transmission and distribution pipeline construction projects. Every feature exists to solve the shortcomings of legacy documentation workflows and to keep pace with the increasing demands of compliance and regulation.

This is not a mockup. This is not a demo. It’s working software used every day in the field and office, on real welds, for real projects. Field captures land via iPhone, sync over cellular to the cloud, and surface in the office before the crew breaks for lunch.

100%
OF WELDS CAPTURED DIGITALLY AT THE SOURCE
~40%
LESS TIME ON DPR PREP*

* SELF-REPORTED · MEASURED ON A LIVE TRANSMISSION PIPELINE PROJECT

06 · GET STARTED

Ready to see it?

Book a 20-minute demo with the inspector who built it. Bring the weld log you're fighting with. We'll show you what Veriweld does with it.

What do you need?

Replies come from Brad@idlewiseventuresllc.com within 24 hours. No drip campaigns, no resellers.