INSPECTION
Dashboard
412 welds · 86 issues · Cedar Crossing
Total Progress
38.4%
412 / 1072
RT Butt
33.5%
312 / 931
MT Fillet
41.0%
100 / 244
Repair Rate
2.6%
8/312
Avg/Day
8.7
47 working days
Issues
86
View →
Daily Production
RT MT
35 25 15 5 02-11 02-20 03-01 03-10 03-20 04-01 04-20
Projected vs Actual by Station
Proj Butt Actual RT Proj Fillet Actual MT
12140 12145 LAUNCHER RECEIVER FILTER MAINLINE 0 100 200 300 400 500
Weld Type Distribution
RT Accepted RT Rejected MT Fillet
Repair Rate by Welder
Accepted Rejected
90 60 30 10 ? KU KU/QV LO LO/MP MP MP/QS MP/QT NV NV/QS QS
Open Issues
86
40 critical · 46 warning
Resolved
0
this session
Welds
412
312 RT · 100 MT
Repair Rate
2.6%
8/312 rejected
All 86
NDT 12
Heat # 71
Repair Rate 3
All Severities 86
Critical 40
Warning 46
NDT NDT weld not in log RTD-MAIN-013 03-15-26
NDT NDT result ≠ weld log result MTD-FIT-007 03-16-26
NDT NDT weld not in log RTD-MAIN-018 03-17-26
NDT NDT result ≠ weld log result RTD-HDD-022 03-19-26
NDT NDT weld not in log RTD-MAIN-031 03-22-26
NDT NDT weld not in log MTD-FIT-014 03-25-26
NDT NDT result ≠ weld log result RTD-MAIN-045 04-02-26
All Types
All Stations
All Results
All Sources
DateWeld #JT/FT #1JT/FT #2 Heat #1Heat #2StationType ReportResultSource
03-15-26RTD-MAIN-001PFT-179JT-4-001HZ4820 MTRHZ4821 MTRLAUNCHERRTAB-01ACCEPTEDEXTRACT
03-15-26RTD-MAIN-002FT-179JT-4-001AHZ4820 MTRHZ4821 MTRLAUNCHERRTAB-02ACCEPTEDEXTRACT
03-15-26RTD-MAIN-003FT-183JT-4-001AHZ4820 MTRHZ4821 MTRLAUNCHERRTAB-03REJECTEDEXTRACT
03-15-26RTD-MAIN-004JT-4-001DFT-183HZ4821 MTRHZ4820 MTRMAINLINERTAB-04ACCEPTEDEXTRACT
03-15-26RTD-MAIN-005JT-4-001DFT-182HZ4822 MTRHZ4820 MTRMAINLINERTAB-05ACCEPTEDEXTRACT
03-15-26RTD-MAIN-006FT-182FT-172HZ4820 MTRHZ4823 MTRMAINLINERTAB-06ACCEPTEDEXTRACT
03-15-26RTD-MAIN-007JT-4-002FT-172HZ4822 MTRHZ4823 MTRMAINLINERTCD-01ACCEPTEDEXTRACT
03-15-26RTD-MAIN-008JT-4-002AFT-172HZ4822 MTRHZ4823 MTRMAINLINERTCD-02ACCEPTEDEXTRACT
03-15-26RTD-MAIN-009JT-4-002AFT-169HZ4822 MTRHZ4824 MTRMAINLINERTCD-03ACCEPTEDEXTRACT
03-15-26RTD-MAIN-010JT-4-002FT-174HZ4822 MTRHZ4820 MTRMAINLINERTCD-04ACCEPTEDEXTRACT
03-15-26RTD-MAIN-011FT-167FT-174HZ4824 MTRHZ4820 MTRMAINLINERTCD-05ACCEPTEDEXTRACT
03-15-26RTD-MAIN-012JT-4-002CFT-164HZ4822 MTRHZ4824 MTRMAINLINERTEF-01ACCEPTEDEXTRACT

Drop any inspection files here

Auto-classifies: weld reports, NDT, coating, DPRs

RT*.pdf → Groove MT*.pdf → Fillet NREP*.pdf → NDT MTR*.pdf → MTR DPR*.xlsx → DPR
Watch Folder Queue
FileTypeEngineStatusConfidenceAction
MTD-FIT-029 AB.pdffilletCLAUDE APINEEDS REVIEW96%
MTD-FIT-030 AB.pdffilletCLAUDE APINEEDS REVIEW94%
MTD-FIT-031 CD.pdffilletCLAUDE APINEEDS REVIEW95%
MTD-FIT-032 CD.pdffilletCLAUDE APINEEDS REVIEW93%
MTD-FIT-033 CD.pdffilletCLAUDE APINEEDS REVIEW97%
MTD-FIT-034 EF.pdffilletCLAUDE APINEEDS REVIEW92%
MTD-FIT-041 EF.pdffilletCLAUDE APINEEDS REVIEW95%
← MAIN |

Material Verification

Cedar Crossing · 78250
Heat · BOM · Traceability
Verified 138
BOM Assigned 96
Assignments 412
138 / 142
Review Queue 18
BOM Browser 142
Unmatched 4
Verified 138
COCs --

Verified Heats

Heat #MaterialBOM AssignmentVerified At
HZ48241", elbolet, F-526 assignments04-14-26 10:20 AM
HZ48251", threadolet9 assignments04-14-26 10:19 AM
HZ48261", threadolet, F-524 assignments04-14-26 10:19 AM
HZ48272", weldolet, F-65LAUNCHER-PIPING-3104-14-26 10:16 AM
HZ48281", elbolet, F-655 assignments04-14-26 10:16 AM
HZ48291", threadolet, F-652 assignments04-14-26 10:09 AM
HZ48301", threadolet, F-523 assignments04-14-26 10:04 AM
HZ48311", threadolet, F-655 assignments04-14-26 10:03 AM
HZ48321", threadolet, F-524 assignments04-14-26 10:02 AM
← MAIN
AWS  ·  ASME  ·  API 1104
ADMIN · DPR REVIEW
Daily Production Reports
14Total 9Mobile 4Auto-Draft 1Manual 3Pending Review 11Approved 04-20-26Last Mobile
All
Mobile Submit
Auto-Draft
Manual
Pending Review
DateDPR #SourceStatusCraftInspectorWeatherWeldsActions
04-20-26DPR-2026-014 Mobile Draft Chief H 62° · L 41° · clear · (site note)
04-19-26DPR-2026-013 Mobile Approved Chief (site note)
04-18-26DPR-2026-012 Mobile Approved
04-18-26DPR-2026-011 Mobile Chief H 58° · L 36° · clear 26 (1r)
04-17-26DPR-2026-010 Auto Draft
04-17-26DPR-2026-009 Mobile Chief H 64° · L 44° · clear 22 (0r)
FIELD CAPTURE · MOBILE

Capture starts at the joint, not at the desk.

The Veriweld mobile app is what every inspector and laborer carries in the field. Offline-first SQLite, camera, GPS, and barcode-scanned heats sync up the moment the truck has signal again.

1

List view with chip filters

Today, repair, hot welds, pending. Chip-filter the log without leaving the screen.

2

Floating action: capture anywhere

The blue button is always there. New weld, new NDT, new coating reading. One tap.

3

Pending sync indicator

Yellow dot means the row is local-only. The data is safe; the cloud just hasn't seen it yet.

9:41●●● ▮▮▮▮

Weld Log

412 welds
All Today Repair Hot Pending
RTD-MAIN-010
04-15 · HZ4820 · CD-04 · RT
RTD-MAIN-009
04-15 · HZ4824 · CD-03 · RT
RTD-MAIN-008
04-15 · HZ4823 · CD-02 · RT
RTD-MAIN-003
04-15 · HZ4821 · AB-03 · RT
RTD-HDD-022
04-16 · HZ4828 · EF-02 · RT
RTD-HDD-023
04-16 · HZ4828 · EF-02 · RT
MTD-FIT-007
04-16 · HZ4827 · EF-03 · MT
+
Inspection software,
built by an inspector.
AWS  ·  ASME  ·  API 1104
Verification, welded in.
veriweld.com
An Idlewise Ventures product
01 / 09