Inspection software,
in your pocket.
FIELD CAPTURE  ·  MOBILE
01 · DASHBOARD

Your project at a glance.

The first screen every inspector sees in the morning. Today's welds, pending NDT, sync status, and the day's DPR. All in one tap-friendly summary tuned for the field.

1

Live project counters

Welds today, NDT pending, sync queue, heat verification. Numbers tracking the day in real time.

2

One-tap capture

The blue button lower-right starts every workflow: new weld, NDT, coating, DPR.

3

DPR auto-draft visible

The day's report is pre-populated and ready to review by end of shift.

9:41●●● ▮▮▮▮

Veriweld

412 welds
Good morning, Brad.
Cedar Crossing · 78250
Welds Today
8
Last: RTD-MAIN-018
Pending NDT
3
Awaiting RT
Sync Queue
2
No signal
Heat Verify
14
2 unmatched
DAILY REPORT
DPR-2026-014
Auto-drafted · ready for review →
+
02 · WELD LOG

Every weld at your fingertips.

Search by weld number, heat, or welder. Filter by today, repair, hot welds, or pending sync. Tap any row to edit. The list scrolls. Long projects, one screen.

1

Instant search

Type a weld number, heat ID, or report prefix. Results filter as you type.

2

Chip filters

Today, repair, hot welds, pending sync. Common filters one tap away.

3

Pending-sync indicator

Yellow dot means the row is local-only. The data is safe; the cloud just hasn't seen it yet.

9:41●●● ▮▮▮▮

Weld Log

412 welds
All Today Repair Hot Pending
RTD-MAIN-018
04-25 · HZ4824 · CD-04 · RT
RTD-MAIN-017
04-25 · HZ4824 · CD-04 · RT
RTD-MAIN-016
04-25 · HZ4823 · CD-03 · RT
RTD-MAIN-015
04-24 · HZ4822 · AB-03 · RT
RTD-MAIN-014
04-24 · HZ4821 · AB-03 · RT
RTD-MAIN-013
04-24 · HZ4821 · AB-02 · RT
RTD-MAIN-012
04-23 · HZ4820 · EF-01 · RT
RTD-MAIN-011
04-23 · HZ4820 · CD-05 · RT
RTD-HDD-023
04-23 · HZ4828 · EF-02 · RT
RTD-HDD-022
04-23 · HZ4828 · EF-02 · RT
RTD-HDD-021
04-22 · HZ4827 · EF-02 · RT
RTD-HDD-020
04-22 · HZ4827 · EF-01 · RT
MTD-FIT-008
04-22 · HZ4826 · CD-04 · MT
MTD-FIT-007
04-22 · HZ4827 · EF-03 · MT
MTD-FIT-006
04-21 · HZ4825 · EF-03 · MT
RTD-MAIN-010
04-21 · HZ4820 · CD-04 · RT
RTD-MAIN-009
04-21 · HZ4824 · CD-03 · RT
RTD-MAIN-008
04-21 · HZ4823 · CD-02 · RT
+
03 · CAPTURE

Capture starts at the joint.

The weld log gets written where the welding happens. Every field optimized for one-handed entry. Heat numbers scanned, GPS auto-stamped, photos one tap away.

1

Heat numbers: scan or type

Scan barcoded tags when the vendor provides them; type when they don't. Either way the field validates against the MTR.

2

GPS auto-stamps

Location captured the moment you save. Stamped with accuracy ±3m.

3

Live WPS qualification

The cert badge turns green when welder + WPS combination is qualified.

9:41●●● ▮▮▮▮

New Weld

MAINLINE
Mainline Butt
SCAN
✓ MTR matched · 20" SCH 80 X65
SCAN
✓ MTR matched · 20" SCH 80 X65
WPS-1104-A
RT
GPS captured · 41.0853°N, 85.1394°W · ±3m
+
✓ WPS-1104-A · qualified
Save & New
Save Weld
04 · HEAT TAG SCAN

Scan it. Or type it.

When the materials vendor ships pipe with barcoded heat tags, scanning kills an entire class of transcription errors (D↔H, I↔1, Q↔0). When the tags aren't barcoded, the same field accepts typed entry. Either way the heat validates against the MTR.

1

Scan when available

Auto-recognizes Code 128, Code 39, and QR. The common formats pipeline mills use, when the vendor provides them.

2

Manual entry as backup

Older tags, smudged labels, no barcode at all: same field accepts typed input with the same MTR cross-check.

3

Cross-references MTR live

Match against the heat database the moment data lands, scanned or typed. Confirms grade, size, schedule.

9:41●●● ▮▮▮▮
Scan heat tag Cancel
Align barcode within frame
Detected
HZ4825
✓ Matched · 20" SCH 80 X65 · API 5L
05 · COATING

DFT readings, in the field.

Coating inspection is just as important as weld inspection, and just as easy to lose to paperwork. Veriweld captures dry film thickness readings, batch numbers, and ambient conditions in one tap.

1

Five-point DFT entry

Standard practice: five readings per location, average tracked, pass/fail computed live.

2

Ambient conditions auto-fetched

Temperature, humidity, dewpoint pulled from local weather. No manual entry.

3

Batch # tied to material

Coating batches link back to mill cert. Full traceability from steel to surface.

9:41●●● ▮▮▮▮

New Coating

RTD-MAIN-008
✓ 20" SCH 80 mainline · MAINLINE
FBE 12-mil
14.2
13.8
14.5
13.9
14.1
Average 14.1 mil PASS
GPS · 41.0853°N, 85.1394°W
Save & New
Save Reading
06 · DAILY REPORT

Your DPR, in your pocket.

End of shift, the chief inspector hits Submit. Weather pre-filled, crew counts pre-populated, narrative AI-drafted from the day's welds and NDT. They review and adjust, never type from scratch.

1

Weather auto-fetched

Temp, wind, sky condition pulled from local station the moment you open the form.

2

Crew + activities checklist

Welders, inspectors, operators by count. Activities by tap. No essay required.

3

AI-drafted narrative

The day's welds, NDT, and corrections compiled into a paragraph. Review and edit.

9:41●●● ▮▮▮▮

Daily Report

Weather (auto-fetched)
H 62° · L 41° · clear · 8 mph WSW
Welding (mainline)
Coating (FBE)
Tie-ins
RT inspection
Narrative AI ASSIST
Crew completed mainline tie-in at STN 12140–12144. Three girth welds released, one fillet completed. RT performed on all mainline welds; no rejections.
Save Draft
Submit
07 · OFFLINE FIRST

Sync when ready. Save anywhere.

Most inspection software assumes good internet. Pipelines run through corn fields, river crossings, and HDD bores where signal is a luxury. Veriweld saves locally first and syncs when connectivity returns.

1

Local SQLite cache

Every weld, every NDT result, every photo. Stored on the device. No signal? No problem.

2

Auto-sync on signal

The moment LTE returns, queued items push up. The dashboard count drops to zero.

3

Conflict resolution built in

If two inspectors edited the same record offline, both versions are preserved and surfaced for review.

9:41○○○ ▮▮▮▮

Sync Status

3 items waiting
No signal · will sync when connection returns
Pending Queue
Weld RTD-HDD-022
Captured · 2 hours ago · 4 photos
Weld RTD-HDD-023
Captured · 2 hours ago · 3 photos
DPR-2026-014
Submitted · 5 minutes ago
Last sync 04-25 · 7:42 AM
Force sync
Verification, welded in.
veriweld.com
An Idlewise Ventures product
01 / 09